Get the Space Coast’s top local news in your inbox.Top local news, free in your inbox.Free. Unsubscribe anytime.

×

The Space Coast Wire

Local news for Brevard County and the Space Coast

Cocoa Road Work & Construction

Closures, road projects, buildings and new businesses in Cocoa, including Rockledge, Port St. John, Sharpes, Canaveral Groves.

13 items

🏗️ Buildings 9

  • Under WayMcDowell Housing Partners Breaks Ground On $38.2 Million Ekos At Rockledge Park In Brevard County, Florida

    Rockledge · News headline · Florida YIMBY (via Google News)

  • Under WayTransit Cocoa Restrooms & Guardshack

    Cocoa · County project (F- Architectural) · Estimated completion: 2027-03-21 · Brevard County Public Works (CIP)

    Details

    Phase 1 Construction of CXT Restroom and Guard Shack. Note that Design was completed under WO # is 5059663.

  • Under WayMcDowell Housing Partners Breaks Ground on Ekos at Rockledge Park, a $38.2 Million Affordable Housing Community

    Rockledge · News headline · Space Coast Daily (via Google News)

  • PlannedTransit Cocoa Modular Replacement

    Cocoa · County project (F- Civil) · Brevard County Public Works (CIP)

    Details

    Transit Cocoa Modular Replacement. We would like to replace the modular office located behind the main building. Requested layout would have 6 offices, duel restrooms, an open are for meetings and an exit door on each side

  • PlannedAgricultural Center Cocoa Shade Structure

    Cocoa · County project (F- Civil) · Brevard County Public Works (CIP)

    Details

    Remove old wooden posts and rebuild a new shade structure to include new wooden posts and nursery-grade mesh top (64% UV blockage) in the nursery area of the Brevard Discovery Garden.

  • PlannedPW R&B Cocoa Maint Fac Feasibility Concept Plan

    Cocoa · County project (F- Other) · Estimated completion: 2024-09-30 · Brevard County Public Works (CIP)

    Details

    Consultants’ services for a Feasibility Concept Plan to include: Boundary & Topography Survey, Preliminary Surface Exploration, Phase I Environmental Site Assessment, Asbestos Survey, Environmental Assessment, Building Condition Assessment, Conceptual Site Plan, Comprehensive Report, Programming Concept Floor Plan, 3D Rendering - Elevations. If required, based on the Phase I ESA report a Phase II Environmental Site Assessment will be conducted.

  • PlannedAgricultural Center Cocoa Dock

    Cocoa · County project (F- Civil) · Brevard County Public Works (CIP)

    Details

    Remove rotted dock structure from the entrance of the Brevard Discovery Garden pond area and replace with new composite deck material.

  • PlannedTransit Cocoa Fuel Tank Replacement

    Cocoa · County project (F- Civil) · Estimated completion: 2027-10-01 · Brevard County Public Works (CIP)

    Details

    Fuel Tanks are Phase I and Concrete Replacement is last phase construction.

  • PlannedPW R&B Cocoa Pole Barn

    Cocoa · County project (F- Architectural) · Brevard County Public Works (CIP)

    Details

    Can we get an Engineer to look at the Cocoa Pole Barn structure fix vs replace.

🏪 New Businesses 4

  • PlannedRocket Bagels Rockledge, 566 Barton Blvd Ste 10

    Rockledge · New restaurant · Florida DBPR new-license file

    Details

    New state license issued (14 seats). Plan review 2026-06-27 (Approved with Provisos). Licensed; opening date not published by the state.

  • PlannedGump's Golden Griddle, 200 Barton Blvd

    Rockledge · New restaurant · Florida DBPR new-license file

    Details

    New state license issued (78 seats). Licensed; opening date not published by the state.

  • PlannedTurning Point of Viera, 1995 Viera Blvd Ste 104

    Rockledge · New restaurant · Florida DBPR new-license file

    Details

    New state license issued (150 seats). Plan review 2026-06-09 (Approved with Provisos). Licensed; opening date not published by the state.

  • PlannedVillage Tap, 409 Delannoy Ave Unit 08&09

    Cocoa · New restaurant · Florida DBPR plan-review file

    Details

    New construction plan filed 2026-05-29; state status: Approved with Provisos (reviewed 2026-05-29). Plan review is an early step; opening date not published.

Copied from public agency sources (FDOT, FL511, county and city records). Dates are the agencies' estimates and can change. Reader reports are labeled and kept separate from official information.

Keep Exploring

Road Work in Other Towns