Projects the agencies list as under way right now, grouped by type.
In the News 9Tap to open
- Under WayNot so welcome to Melbourne: Station Pier compared to โdesolate car parkโ
- Under WayBuyer's plans revealed for 22-acre Viera land sale
- Under WayMargarita Island plans fourth restaurant in Brevard County
- Under WayMcDowell Housing Partners Breaks Ground On $38.2 Million Ekos At Rockledge Park In Brevard County, Florida
- Under WayBuilding the Spaceport of the Future From the Ground Up
- Under WaySpaceX plans 32-mile natural gas pipeline through Brevard County
- Under WayViera Hospital adds 20 beds to meet rising demand
- Under WaySouth Patrick Drive project brings noise, delays in Brevard County
- Under WayMcDowell Housing Partners Breaks Ground on Ekos at Rockledge Park, a $38.2 Million Affordable Housing Community
Architectural 8Tap to open
- Under WayFac_MJC Courtroom Expansion
Details
Courtroom Renovation & Expansion Project.
- Under WayFire Station 86
Details
Design, Permitting, and Construction of new 8,800 sqft 3 bay CMU construction Fire Station
- Under WayTransit Cocoa Restrooms & Guardshack
Details
Phase 1 Construction of CXT Restroom and Guard Shack. Note that Design was completed under WO # is 5059663.
- Under WayBCGCV Bldg D SAO Trendwall Office Build Out
Details
Develop scope and estimate for this trendwall / office build out.
- Under WayFire Station 40 New Construction
Details
Design and Construct an approximately 6,598 sf Fire Station to replace the existing FS 40. Project address is 4615 N. Courtenay Pkwy, Merritt Island, FL 32953
- Under WayUtilities Micco Demolition of Hotel
Details
Per mtg with Tim, Utilities requests a quote for the demolition of an existing hotel at this location to include asbestos and lead survey/hazardous materials if necessary. Demo entire structure including detached building behind hotel and small shed. Remove all debris and vehicles. Abandoned septic tank and remove if needed. Abandoned well. FPL electrical overhead needs to be disconnected and removed. Do not remove any pavement up to the building. Grade rest of property. There is no city water or sewer to this building.
- Under WayPW Fac_BCGCV C Commission Rm Dias Reconstruction
Details
Reconstruct Commission Room Dias
- Under WayHealth Dept Viera Bldg Env Design & Const.
Details
Building Envelope Design & Construction
Mechanical 4Tap to open
- Under WayPW Fac Titusville BCGCN-VAV replacement
Details
Provide engineering and construction services to replace 160 VAV boxes throughout the 6 story building with their associated controls.
- Under WayFAC_BCGCV AHU Replacement
Details
Replace 26 existing air handlers in Bldgs A-E with new Bosch units.
- Under WayPW_Fac_BCGCV_Bldg C_Elevator Modernizations
Details
Building C Elevator Modernizations
- Under WayPW Fac BCDC Plumbing Chases MULTI YR
Details
Plumbing in the existing plumbing chases is beyond it's useful life and needs to be replaced. Replace all water and waste water piping in the chases, also replace the exhaust ducts and the exhaust fans
Building Envelope 3Tap to open
- Under WayPW Pineda Traffic Management Center
Details
Design and construct a structure to house the County TMC Function, and to include SCTPO board meeting room, and SCTPO management offices
- Under WayBCDC Tents 2 3 4 Temp Protection
Details
Provide Temporary protection from elements from leaks in Tents 2, 3, and 4. EPO
- Under WayLib Svcs_Sat. Bch_Access Panel
Details
Per Jim Monarchy, please provide a quote to cut in and install an access panel in the ceiling to provide a better access and visibility in trying to track the leak down in the South side book drop. Picture will be sent through email. Please check with director before starting & after job is complete. Thanks.
Other 5Tap to open
- Under WayPW Fac_CSCMI_GAL to Melbourne
Details
Move GAL from CSCMI to new leased space is located at 1990 W New Haven Avenue, Space #304. Include communications.
- Under WayPW Fac_CSC-MI_stormwater-system
Details
Multi year project. Part 1 completed. Part 2 anticipated FY25/26 to install new storm drains in the building courtyards w/ downspout connection and install new fencing and regrade around the EOC antenna. Part 2 est. $80K. Part 3 est. $225K.
- Under WayFAC_Clerk Proj FY 26 - Multi year
Details
This is a CIP budget that is to replace flooring in clerk locations as the clerk sees fit!
- Under WayPW R&B/Fleet/Const/Maint Wickham Fac. Masterplan
Details
Design of Masterplan for the Wickham Facility including construction of site utilities, and building structures.
- Under WayMedical Examiner_Chiller
Details
Getting a MEP to take a look at the current usage of the building compared to the initial intended use to ensure the building as a whole will be able to support a chiller unit as well as the current generator. Taking a look at the need of exhaust fans in garage that is now set up as a lab area.