Countywide Buildings
Brevard County buildings listed for the county as a whole, grouped by type.
Architectural 17Tap to open
- Under WayFac_MJC Courtroom Expansion
Details
Courtroom Renovation & Expansion Project.
- Under WayFire Station 86
Details
Design, Permitting, and Construction of new 8,800 sqft 3 bay CMU construction Fire Station
- Under WayBCGCV Bldg D SAO Trendwall Office Build Out
Details
Develop scope and estimate for this trendwall / office build out.
- Under WayFire Station 40 New Construction
Details
Design and Construct an approximately 6,598 sf Fire Station to replace the existing FS 40. Project address is 4615 N. Courtenay Pkwy, Merritt Island, FL 32953
- Under WayUtilities Micco Demolition of Hotel
Details
Per mtg with Tim, Utilities requests a quote for the demolition of an existing hotel at this location to include asbestos and lead survey/hazardous materials if necessary. Demo entire structure including detached building behind hotel and small shed. Remove all debris and vehicles. Abandoned septic tank and remove if needed. Abandoned well. FPL electrical overhead needs to be disconnected and removed. Do not remove any pavement up to the building. Grade rest of property. There is no city water or sewer to this building.
- Under WayPW Fac_BCGCV C Commission Rm Dias Reconstruction
Details
Reconstruct Commission Room Dias
- PlannedPW Fac_CSCMI_Roof DESIGN ONLY
Details
CSC Merritt Island Roof Design
- PlannedPW Fac_BCGCV Bldg A Space Planning Study
Details
BCGC Viera Space Planning Study Bldg A
- PlannedFire Station 42
Details
Demolish and Construct an approximately 6,100sf Fire Station located at 840 N. Banana River Dr., Merritt Island.
- PlannedFire Station 22 Butler Bldg Wall Damage
Details
South wall of the butler building is bowed out. 12 to 15 cinder blocks have been knocked down.
- PlannedFire Rescue FS 83 Remodel
Details
Remodel of Station 83 # to include, but not limited to: flooring removal and replacement, new interior 2x2 drop ceilings with new lighting, complete kitchen remodel, and complete bathroom renovation. please contact chief Rutkowski at 321-795-7091 with any questions.
- PlannedUtilities_ Sykes Creek_ Ops Bldg_ Carpet
Details
Phase 1: September Complete preemptive asbestos testing (Partner). - Phase 2: Carpet replacement, reprice w/ Interior Flooring Solutions (Tarkett) mid October / November. Original: Provide Utilities with quote for carpet. Please provide quotes to have carpet installed in the entire Ops Building, Option 1: 3 offices only. Contact Phil Bissett @ 321-455-1338; phillip.bissett@brevardfl.gov
- PlannedUtilities South Central WWTP Restrooms
Details
South Central Wastewater Treatment Plant; 10001 N. Wickham Rd., Viera 32940-Operations Building Hours: M-F 7am-3:30pm Please provide an estimate to renovate the bathrooms in the Operations Building. Contact: Terry Linkenhoker@321-255-4328; terry.linkenhoker@brevardfl.gov or Sherman Huffman @ ext 58368; sherman.huffman@brevardfl.gov Fund: 4150 Cost Center: 365130
- PlannedUtilities Barefoot Bay WWTP Restrooms
Details
Please provide an estimate to renovate the bathrooms in both the Operations Building and the Maintenance Building. Contact: Sherman Huffman @ extension 58368; sherman.huffman@brevardfl.gov Fund: 4250 Cost Center: 365410
- PlannedFire Rescue_Drill Yard_Modular Replacement
Details
Drill yard classroom and bathroom modular replacement to include, if applicable, septic or sewer requirements. Please contact Chief Rutkowski at 321-795-7091 if you have any questions.
- PlannedClerk of Court_BCGCN-2ndFL_Add Doorway
Details
We are preparing for renovations in our customer service office located on the 2nd floor of NBGC. We are unable to locate a current floorplan of the area but attached is what it will look like once completed. We are wanting to know if it will be possible to add a doorway (no door necessary) to the highlighted wall. Can you confirm a doorway is able to be put into this wall? And if so, where in the wall could it be placed?
- PlannedFire Station 44 Renovation DESIGN ONLY
Details
Design to completely renovate existing fire station 44
Mechanical 11Tap to open
- Under WayFAC_BCGCV AHU Replacement
Details
Replace 26 existing air handlers in Bldgs A-E with new Bosch units.
- Under WayPW_Fac_BCGCV_Bldg C_Elevator Modernizations
Details
Building C Elevator Modernizations
- Under WayPW Fac BCDC Plumbing Chases MULTI YR
Details
Plumbing in the existing plumbing chases is beyond it's useful life and needs to be replaced. Replace all water and waste water piping in the chases, also replace the exhaust ducts and the exhaust fans
- PlannedPW Fac CSCMI Cooling Tower & Pump
Details
Design and replace the existing cooling tower & pumps at the MISC
- PlannedPW Fac CSCTville CW AHU Design Only
Details
CSC Titusville Chilled Water Air Handler Design
- PlannedPW Fac_MJC Cooling Tower and Pump DESIGN ONLY
Details
MJC Cooling Tower and Pump design.
- PlannedPW Fac_MJC BAS Upgrade
Details
Moore Justice Center Building Automated Systems Upgrade with Trane.
- PlannedPW Fac_HTCH_Air Handler Units DESIGN ONLY
Details
Air Handler Units design.
- PlannedParks & Rec EEL Barrier Island Water Treatment
Details
Nichole Perna 321-723-3556, cell 609-408-5042 Requesting the water treatment plant for the building be evaluated due to age and possible replacement.
- PlannedParks & Rec EEL Maritime Hammock Well Head
Details
Nichole Perna 321-723-3556 or cell 609-408-5042 The well head at Maritime Hammock is corroded and moisture appeared to seeping through part of the main well pipe below the cut off valve. Please let Nichole know when someone will becoming to check it out as it is behind a locked gate.
- PlannedFire Rescue_FS 87_ Diesel to Electric Pump Conv.
Details
The existing diesel driven pump is currently down. Fire would like to convert from a diesel driven pump to electric pump. It is unclear if the required electrical infrastructure is available.
Agendas 6Tap to open
- PlannedGail Diffendorfer Revocable Trust (Gail Diffendorfer) requests a variance of Chapter 62, Article VI, Brevard County Code, for an accessory structure in an RU-1-9 zoning classification. (26V00059)โฆ
Details
Board of Adjustment meeting 2026-10-14, item H.2..
- PlannedAfimi Corp. Inc. and Cecil Miller (Russell Fasnacht) request a variance of Chapter 62, Article VI, Brevard County Code, for a principal structure in a TR-1 zoning classification. (26V00060) (Taxโฆ
Details
Board of Adjustment meeting 2026-10-14, item H.3..
- PlannedBaratta Family Trust (John Campbell) requests two variances of Chapter 62, Article VI, Brevard County Code, for a swimming pool screen enclosure and the principal building in an RU-1-11 zoningโฆ
Details
Board of Adjustment meeting 2026-10-14, item H.4..
- PlannedSmith Tima requests three variances of Chapter 62, Article VI, Brevard County Code, for the lot width, the lot depth, and the lot size in a TR-1 zoning classification. (26V00054) (Tax Accountโฆ
Details
Board of Adjustment meeting 2026-10-14, item H.1..
- PlannedIn accordance with the Americans with Disabilities Act and Section 286.26, Florida Statutes, persons needing special accommodations or an interpreter to participate in the proceedings, please notifyโฆ
Details
Board of Adjustment meeting 2026-10-14.
- PlannedIn accordance with the Americans with Disabilities Act and Section 286.26, Florida Statutes, persons needing special accommodations or an interpreter to participate in the proceedings, please notifyโฆ
Details
Planning and Zoning Board / Local Planning Agency meeting 2026-10-12.
Civil 6Tap to open
- Under WayPW R&B/Fleet/Const/Maint Wickham Fac. Masterplan
Details
Design of Masterplan for the Wickham Facility including construction of site utilities, and building structures.
- PlannedPW Fac_BCGCV_Sidewalk/Parking Lot Repairs
Details
BCGC Viera Sidewalk and Parking Lot Repairs. Start with perimeter sidewalks.
- PlannedFire Rescue_FS 90_ Concept Plan
Details
Concept site plan for future Station 90 rescue only. 1207 Eber Blvd, Melbourne
- PlannedPW Survey Shed Relocation
Details
NEED AN COST ESTIMATE TO MOVE A METAL BUILDING ABOUT A HALF (0.5) MILES WITHIN THE SAME AREA OR NEAR THE LOCATION OF WHERE THE BUILDING IS LOCATED NOW. THE BUILDING IS METAL AND SEE ATTACHED PICTURES FOR MORE INFORMATION. BUILDING IS 18X25X10 STEEL.
- PlannedTransit_Clearlake 3 Bus Shelters
Details
We need 3 bus shelters installed at 3 different locations off of Clearlake Rd. in Cocoa. Clearlake Rd& EFSC, Clearlake Rd & Dixon Blvd (SW Corner), and Clearlake Rd. & Sunhome St (NW Corner). Construction plans will be emailed for clarity.
- PlannedFire Rescue FS 26 Culvert Pipe
Details
Issue with culvert pipe and drainage. Billy Wahne is aware of issue and is working on it.
Other 4Tap to open
- Under WayPW Fac_CSC-MI_stormwater-system
Details
Multi year project. Part 1 completed. Part 2 anticipated FY25/26 to install new storm drains in the building courtyards w/ downspout connection and install new fencing and regrade around the EOC antenna. Part 2 est. $80K. Part 3 est. $225K.
- Under WayFAC_Clerk Proj FY 26 - Multi year
Details
This is a CIP budget that is to replace flooring in clerk locations as the clerk sees fit!
- PlannedPW R&B Mer Is Maint Fac Feasibility Concept Plan
Details
Consultantsโ services for a Feasibility Concept Plan to include: Boundary & Topography Survey, Preliminary Surface Exploration, Phase I Environmental Site Assessment, Asbestos Survey, Environmental Assessment, Building Condition Assessment, Conceptual Site Plan, Comprehensive Report, Programming Concept Floor Plan, 3D Rendering - Elevations. If required, based on the Phase I ESA report a Phase II Environmental Site Assessment will be conducted.
- PlannedPW R&B Titus Maint Fac Feasibility Concept Plan
Details
Consultants services for Feasibility Concept Plan to include: Boundary & Topography Survey, Preliminary Surface Exploration, Phase I Environmental Site Assessment, Asbestos Survey, Environmental Assessment, Building Condition Assessment, Conceptual Site Plan, Comprehensive Report, Programming Concept Floor Plan, 3D Rendering - Elevations. If required, based on the Phase I ESA report a Phase II Environmental Site Assessment will be conducted.
Building Envelope 3Tap to open
- Under WayPW Pineda Traffic Management Center
Details
Design and construct a structure to house the County TMC Function, and to include SCTPO board meeting room, and SCTPO management offices
- Under WayBCDC Tents 2 3 4 Temp Protection
Details
Provide Temporary protection from elements from leaks in Tents 2, 3, and 4. EPO
- PlannedP&R_ McKnight Park Tennis
Details
Assessment for Mold and Termites needed.
In the News 3Tap to open
- Under WayMargarita Island plans fourth restaurant in Brevard County
- Under WaySpaceX plans 32-mile natural gas pipeline through Brevard County
- Under WayQuestions mount after deadly accident at Brevard County elementary school
Electrical 1Tap to open
- Under WayMedical Examiner_Chiller
Details
Getting a MEP to take a look at the current usage of the building compared to the initial intended use to ensure the building as a whole will be able to support a chiller unit as well as the current generator. Taking a look at the need of exhaust fans in garage that is now set up as a lab area.