Building Projects: Planned
Projects on the official lists that haven't started yet, grouped by type.
Architectural 16Tap to open
- PlannedPW Fac_CSCMI_Roof DESIGN ONLY
Details
CSC Merritt Island Roof Design
- PlannedPW Fac_BCGCV Bldg A Space Planning Study
Details
BCGC Viera Space Planning Study Bldg A
- PlannedFire Rescue_FS 64 DESIGN ONLY
Details
Design & Engineering for a new Fire Station 64
- PlannedFire Station 42
Details
Demolish and Construct an approximately 6,100sf Fire Station located at 840 N. Banana River Dr., Merritt Island.
- PlannedFire Station 22 Butler Bldg Wall Damage
Details
South wall of the butler building is bowed out. 12 to 15 cinder blocks have been knocked down.
- PlannedFire Rescue FS 83 Remodel
Details
Remodel of Station 83 # to include, but not limited to: flooring removal and replacement, new interior 2x2 drop ceilings with new lighting, complete kitchen remodel, and complete bathroom renovation. please contact chief Rutkowski at 321-795-7091 with any questions.
- PlannedUtilities_ Sykes Creek_ Ops Bldg_ Carpet
Details
Phase 1: September Complete preemptive asbestos testing (Partner). - Phase 2: Carpet replacement, reprice w/ Interior Flooring Solutions (Tarkett) mid October / November. Original: Provide Utilities with quote for carpet. Please provide quotes to have carpet installed in the entire Ops Building, Option 1: 3 offices only. Contact Phil Bissett @ 321-455-1338; phillip.bissett@brevardfl.gov
- PlannedUtilities South Central WWTP Restrooms
Details
South Central Wastewater Treatment Plant; 10001 N. Wickham Rd., Viera 32940-Operations Building Hours: M-F 7am-3:30pm Please provide an estimate to renovate the bathrooms in the Operations Building. Contact: Terry Linkenhoker@321-255-4328; terry.linkenhoker@brevardfl.gov or Sherman Huffman @ ext 58368; sherman.huffman@brevardfl.gov Fund: 4150 Cost Center: 365130
- PlannedUtilities South Beaches Ops Building Reno
Details
Please provide an estimate to remove existing counters, sink and vent hood in the old lab to create space for cubicles, potentially accommodating 3-4 additional employees.
- PlannedUtilities Barefoot Bay WWTP Restrooms
Details
Please provide an estimate to renovate the bathrooms in both the Operations Building and the Maintenance Building. Contact: Sherman Huffman @ extension 58368; sherman.huffman@brevardfl.gov Fund: 4250 Cost Center: 365410
- PlannedFire Rescue_Drill Yard_Modular Replacement
Details
Drill yard classroom and bathroom modular replacement to include, if applicable, septic or sewer requirements. Please contact Chief Rutkowski at 321-795-7091 if you have any questions.
- PlannedMosquito Control Titusville Lab
Details
Construction of a new Mosquito Control Labratory
- PlannedClerk of Court_BCGCN-2ndFL_Add Doorway
Details
We are preparing for renovations in our customer service office located on the 2nd floor of NBGC. We are unable to locate a current floorplan of the area but attached is what it will look like once completed. We are wanting to know if it will be possible to add a doorway (no door necessary) to the highlighted wall. Can you confirm a doorway is able to be put into this wall? And if so, where in the wall could it be placed?
- PlannedPW Fac CSC Palm Bay 2nd Damages by Car
Details
Customer ran into the front of the building in Palm Bay. Needs assessment/ repair.
- PlannedFire Station 44 Renovation DESIGN ONLY
Details
Design to completely renovate existing fire station 44
- PlannedPW R&B Cocoa Pole Barn
Details
Can we get an Engineer to look at the Cocoa Pole Barn structure fix vs replace.
Civil 12Tap to open
- PlannedPW Fac_BCGCV_Sidewalk/Parking Lot Repairs
Details
BCGC Viera Sidewalk and Parking Lot Repairs. Start with perimeter sidewalks.
- PlannedMIRA_SR 520 Transit Bus Shelters
Details
MIRA would like to get started with the design permitting and construction of 3 possibly 4 additional transit shelters, in the likeness of the last four that Facilities completed for MIRA. We have discussed 4 tentative locations with Transit. 1. New Cape Canaveral Hospital 2. New Chase Bank (former Denny's 3.First Merritt Island Baptist 4. 400 W Merritt Island Causeway (7-11 store)
- PlannedTransit Cocoa Modular Replacement
Details
Transit Cocoa Modular Replacement. We would like to replace the modular office located behind the main building. Requested layout would have 6 offices, duel restrooms, an open are for meetings and an exit door on each side
- PlannedLib Svcs_Suntree Viera Library_ Trip hazards
Details
902 Jordan Blass Drive, Melbourne, FL 32940 POC: Heather Palmer, Director #255-4404, hpalmer@brev.org Desc: We have several places in the surrounding sidewalks that need ground down to level out trip hazards. Urgent. Please check with director before starting & after job is complete. Thanks.
- PlannedAgricultural Center Cocoa Shade Structure
Details
Remove old wooden posts and rebuild a new shade structure to include new wooden posts and nursery-grade mesh top (64% UV blockage) in the nursery area of the Brevard Discovery Garden.
- PlannedPW Fac_CSC Palm Bay_Parking Lot Hole
Details
Repair parking lot hole.
- PlannedFire Rescue_FS 90_ Concept Plan
Details
Concept site plan for future Station 90 rescue only. 1207 Eber Blvd, Melbourne
- PlannedPW Survey Shed Relocation
Details
NEED AN COST ESTIMATE TO MOVE A METAL BUILDING ABOUT A HALF (0.5) MILES WITHIN THE SAME AREA OR NEAR THE LOCATION OF WHERE THE BUILDING IS LOCATED NOW. THE BUILDING IS METAL AND SEE ATTACHED PICTURES FOR MORE INFORMATION. BUILDING IS 18X25X10 STEEL.
- PlannedAgricultural Center Cocoa Dock
Details
Remove rotted dock structure from the entrance of the Brevard Discovery Garden pond area and replace with new composite deck material.
- PlannedTransit_Clearlake 3 Bus Shelters
Details
We need 3 bus shelters installed at 3 different locations off of Clearlake Rd. in Cocoa. Clearlake Rd& EFSC, Clearlake Rd & Dixon Blvd (SW Corner), and Clearlake Rd. & Sunhome St (NW Corner). Construction plans will be emailed for clarity.
- PlannedTransit Cocoa Fuel Tank Replacement
Details
Fuel Tanks are Phase I and Concrete Replacement is last phase construction.
- PlannedFire Rescue FS 26 Culvert Pipe
Details
Issue with culvert pipe and drainage. Billy Wahne is aware of issue and is working on it.
Mechanical 9Tap to open
- PlannedPW Fac CSCMI Cooling Tower & Pump
Details
Design and replace the existing cooling tower & pumps at the MISC
- PlannedPW Fac CSCTville CW AHU Design Only
Details
CSC Titusville Chilled Water Air Handler Design
- PlannedPW Fac_MJC Cooling Tower and Pump DESIGN ONLY
Details
MJC Cooling Tower and Pump design.
- PlannedPW Fac_MJC BAS Upgrade
Details
Moore Justice Center Building Automated Systems Upgrade with Trane.
- PlannedPW Fac CSC Merritt Island BAS Upgrade
Details
County Service Complex Merritt Island Building Automated System Upgrade.
- PlannedPW Fac_HTCH_Air Handler Units DESIGN ONLY
Details
Air Handler Units design.
- PlannedParks & Rec EEL Barrier Island Water Treatment
Details
Nichole Perna 321-723-3556, cell 609-408-5042 Requesting the water treatment plant for the building be evaluated due to age and possible replacement.
- PlannedParks & Rec EEL Maritime Hammock Well Head
Details
Nichole Perna 321-723-3556 or cell 609-408-5042 The well head at Maritime Hammock is corroded and moisture appeared to seeping through part of the main well pipe below the cut off valve. Please let Nichole know when someone will becoming to check it out as it is behind a locked gate.
- PlannedFire Rescue_FS 87_ Diesel to Electric Pump Conv.
Details
The existing diesel driven pump is currently down. Fire would like to convert from a diesel driven pump to electric pump. It is unclear if the required electrical infrastructure is available.
Agendas 8Tap to open
- PlannedIndian Harbour Beach City Council agenda, 2026-10-22: Regular City Council Meeting at 7:00 pm
Details
Agenda posted 2026-10-22. Open the agenda to see site plans, development requests and road items.
- PlannedGail Diffendorfer Revocable Trust (Gail Diffendorfer) requests a variance of Chapter 62, Article VI, Brevard County Code, for an accessory structure in an RU-1-9 zoning classification. (26V00059)โฆ
Details
Board of Adjustment meeting 2026-10-14, item H.2..
- PlannedAfimi Corp. Inc. and Cecil Miller (Russell Fasnacht) request a variance of Chapter 62, Article VI, Brevard County Code, for a principal structure in a TR-1 zoning classification. (26V00060) (Taxโฆ
Details
Board of Adjustment meeting 2026-10-14, item H.3..
- PlannedBaratta Family Trust (John Campbell) requests two variances of Chapter 62, Article VI, Brevard County Code, for a swimming pool screen enclosure and the principal building in an RU-1-11 zoningโฆ
Details
Board of Adjustment meeting 2026-10-14, item H.4..
- PlannedSmith Tima requests three variances of Chapter 62, Article VI, Brevard County Code, for the lot width, the lot depth, and the lot size in a TR-1 zoning classification. (26V00054) (Tax Accountโฆ
Details
Board of Adjustment meeting 2026-10-14, item H.1..
- PlannedIn accordance with the Americans with Disabilities Act and Section 286.26, Florida Statutes, persons needing special accommodations or an interpreter to participate in the proceedings, please notifyโฆ
Details
Board of Adjustment meeting 2026-10-14.
- PlannedIndian Harbour Beach City Council agenda, 2026-10-13: Regular City Council Meeting at 7:00 pm
Details
Agenda posted 2026-10-13. Open the agenda to see site plans, development requests and road items.
- PlannedIn accordance with the Americans with Disabilities Act and Section 286.26, Florida Statutes, persons needing special accommodations or an interpreter to participate in the proceedings, please notifyโฆ
Details
Planning and Zoning Board / Local Planning Agency meeting 2026-10-12.
Building Envelope 3Tap to open
- PlannedLib Svcs_Merritt Island Library Bldg Env./Cracks
Details
Evaluate building envelope to fill in cracks as needed before pressure washing is done.
- PlannedSouth Beaches WWTP Radio Tower Shelter
Details
Replace the existing shelter building with a new one and make all necessary power and communication connections
- PlannedP&R_ McKnight Park Tennis
Details
Assessment for Mold and Termites needed.
Other 3Tap to open
- PlannedPW R&B Mer Is Maint Fac Feasibility Concept Plan
Details
Consultantsโ services for a Feasibility Concept Plan to include: Boundary & Topography Survey, Preliminary Surface Exploration, Phase I Environmental Site Assessment, Asbestos Survey, Environmental Assessment, Building Condition Assessment, Conceptual Site Plan, Comprehensive Report, Programming Concept Floor Plan, 3D Rendering - Elevations. If required, based on the Phase I ESA report a Phase II Environmental Site Assessment will be conducted.
- PlannedPW R&B Cocoa Maint Fac Feasibility Concept Plan
Details
Consultantsโ services for a Feasibility Concept Plan to include: Boundary & Topography Survey, Preliminary Surface Exploration, Phase I Environmental Site Assessment, Asbestos Survey, Environmental Assessment, Building Condition Assessment, Conceptual Site Plan, Comprehensive Report, Programming Concept Floor Plan, 3D Rendering - Elevations. If required, based on the Phase I ESA report a Phase II Environmental Site Assessment will be conducted.
- PlannedPW R&B Titus Maint Fac Feasibility Concept Plan
Details
Consultants services for Feasibility Concept Plan to include: Boundary & Topography Survey, Preliminary Surface Exploration, Phase I Environmental Site Assessment, Asbestos Survey, Environmental Assessment, Building Condition Assessment, Conceptual Site Plan, Comprehensive Report, Programming Concept Floor Plan, 3D Rendering - Elevations. If required, based on the Phase I ESA report a Phase II Environmental Site Assessment will be conducted.
Copied from public agency sources (FDOT, FL511, county and city records). Dates are the agencies' estimates and can change. Reader reports are labeled and kept separate from official information.